Who Builds the Moon?
EMGT 5061 · Introduction to Space Industry · Fall 2026

Who Builds the Moon?

Lunar autonomy and robotics, commercial habitats on the Moon, and habitats in orbit. You are the engineer advising an investment firm. Three fictional companies have pitched you.

October 21, 2026Dr. Bidushi BhattacharyaRecord your answers in this week's student deck

This week's companies

Three fictional companies are under consideration this week.

Perigee House

ProductA four-bed expandable module in low Earth orbit. Guests stay 5 to 7 days, then fly home.
TransportPerigee owns no crew vehicle. It buys whole flights from one crew transport provider. Each flight carries four people.
HardwareA full-size module has passed pressure tests on the ground, and a 30-day crew test in a ground mockup is complete. Nothing has flown. The automated systems for a stay with no crew aboard have been tested only in computer simulation.
FundingRaising money now to build and launch the module.

Hexpave Lunar

Founded2024, U.S. Raised a $40M Series A from a space VC fund and a construction-materials company.
ProductSix autonomous rovers, about 150 kg each. They sinter regolith into hexagonal pavers with microwaves and lay pads, berms and roads.
OperationsSupervised autonomy from Earth, with a round-trip delay of about 2.5 seconds.
CustomersOne-Sixth Park (anchor), a NASA Moon Base pad bid, lander companies.

One-Sixth Park

FoundedU.S. Media and theme-park veterans, backed by VC, a gaming studio and brand sponsors.
SiteA flat near-side mare plain in view of Earth, about 40 km from the nearest Apollo landing site.
OwnsNo robots. Hires Hexpave and buys lander rides.
Revenue nowSubscribers on Earth drive a real rover, plus livestreams, gaming licenses and naming rights. Crewed visitors come later.

How the three companies connect

Same module, two worlds

One-Sixth Park's worker quarters use the same expandable module that Perigee House flies in orbit. Perigee's first flight is the module's first test in space.

Orbit first, Moon later

Perigee House's guests are One-Sixth Park's most likely future visitors. People who pay for a week in orbit are the best prospects for a trip to the Moon, so Perigee's bookings are the first real evidence of demand for crewed lunar visits.

In orbit

Perigee House: a hotel in orbit

Perigee House wants to run the first hotel in low Earth orbit. Before your firm invests, Perigee has to decide how a stay will run: with only guests aboard, or with its own crew.

Two ways to run a stay

Model A: Autonomous

No Perigee crew aboard. The crew vehicle flies itself, and the module runs on automated systems watched by mission control on the ground. All four seats go to paying guests.

Model B: Crewed

One or two Perigee crew members fly up with each group and stay the whole visit: a commander, and if there are two, a host who is also a flight engineer. That leaves three seats for guests, or two.

Both have precedent. Crew Dragon is designed to fly itself, and Inspiration4 (2021) carried four private crew with no professional astronaut aboard. NASA requires private missions to the ISS to have an experienced former astronaut as commander, which is why every Axiom flight gives up one seat.

Perigee's costs

ItemModel A: AutonomousModel B: Crewed
Module, built and launched$700M, including $100M for the automated systems$600M
Crew flights the provider will sell Perigee2 in year 1, 4 in year 22 in year 1, 4 in year 2
One crew flight (four seats)$70M$70M
Supplies, cargo and operations per visit$10M$10M
Perigee crewNone$5M per crew member per visit
Guest training8 weeks, $2M per guest, paid by PerigeeA short course, included in operations
Fixed costs: mission control, staff, insurance$50M a year, including $10M more for insurance$40M a year
Turnaround between visits10 days10 days

Who wants a seat

CustomerPrice per seatWhat they've signed
Governments, for national astronauts$60M2 countries have binding contracts, 1 seat each. 4 more have signed letters of intent, 1 seat each.
A pharmaceutical company, for its researchers$45MA binding contract for 2 seats over two years
Private travelers$35M; $45M for a hosted stay with crew aboard6 have paid refundable $1M deposits. 11 more have expressed interest.
A streaming company$8M per visit, no seatFilming rights, signed for the first visit only

Perigee House and all of its figures are fictional, for teaching.

Exercise 1: Who's in the four seats?

Your instructor will give each pair one model: autonomous, crewed with one crew member, or crewed with two. Work through the questions for your model, then compare results with the class.

1.1

Capacity. Under your model, how many guest seats can Perigee sell in year 1 and in year 2? With 7-day stays, how many days a year is the module occupied? What limits it: the module or the flights?

1.2

Fill the seats. Using the Who wants a seat table, plan who flies in years 1 and 2. Who goes first, and why? Is there enough demand to fill your seats?

1.3

Does it pay? Compare each year's revenue with its costs. At your year-2 result, roughly how many years would it take to pay back the module?

1.4

Recommend. Which model would you recommend to your firm, and what risk does it leave Perigee carrying?

Due before October 28, 3 pm

Answer in this week's student deck and upload it to Canvas.

On the Moon

On the Moon: Hexpave Lunar and One-Sixth Park

Hexpave Lunar builds infrastructure with robots. One-Sixth Park hires it to build the first amusement park on the Moon. Both depend on what Perigee House proves in orbit.

The contract and the build

A $120M fixed-price, milestone-based contract, modeled on NASA's CLPS approach: 20% at signing, then payments only when each structure passes an acceptance test on the Moon. Hexpave may sell pads to other customers. One-Sixth Park buys the lander rides, and buys its habitat module from Perigee House. Each company insures its own hardware.

  1. 1

    Landing pad

    2028

    Rovers grade the site and lay a 30 m pad with a berm, so every later lander touches down on a hard surface.

  2. 2

    Worker quarters

    2029–2030

    A second lander delivers an expandable module built on Earth to Perigee House's design. Hexpave's robots build a vaulted shell of sintered pavers over it, leaving a gap so no weight rests on the module. The shell protects against radiation, micrometeoroids and the temperature swings of the lunar day and night. At first the workers are mostly robots: the quarters include a bay to charge, repair and survive the two-week lunar night.

  3. 3

    The park

    2031 onward

    Unpressurized attractions first, such as a low-gravity jump zone and a rover race track. Pressurized rides and crewed visitors only when transport allows.

Both companies and every figure here are fictional, for teaching.

Homework 1

The investment committee

H1.1

Your firm has room for one lunar deal this year. Fund Hexpave, One-Sixth Park, both, or neither?

H1.2

Name the one milestone that would have to happen before you funded the company you passed on.

H1.3

If One-Sixth Park failed tomorrow, would Hexpave still be worth funding? What does your answer say about the value of having separate companies?

H1.4

Perigee House's first flight slips by a year. What does that do to One-Sixth Park's plans?

Homework 2

Design one attraction for one-sixth gravity

Lunar gravity is 1.62 m/s², about one-sixth of Earth's 9.81 m/s². Use the calculator to see what that does to rides.

Drop height on EarthDrop height on the Moon
Same bounce on the MoonTime in the air, Moon

Assumes the visitor leaves the trampoline at the same speed on the Moon as on Earth.

H2.1

Choose either attraction above, the roller coaster or the trampoline. Give it a TRL, then say what test would move it up one level.

To help you, here is what would move each attraction from TRL 1 to TRL 2. You can't use these examples as your answer.

  • Roller coaster: engineers go from the known physics of a cart rolling under one-sixth gravity (TRL 1) to a written concept for a specific coaster, giving its track length, drop height, dust-tolerant wheels and how riders are held in their seats (TRL 2).
  • Trampoline: engineers go from measurements of how springs and mat fabric behave in cold and vacuum (TRL 1) to a written concept for a trampoline inside a pressurized dome, giving the bounce height, the ceiling clearance it needs and the mat material (TRL 2).

TRL and MRL

For worked examples of both ladders, see Ready for the Moon? Use it and the definitions below to complete Homework 3.

Ladder definitions (TRL 1–9 and MRL 0–9)
TRLTechnology Readiness (NASA)
MRLMarket Readiness (Mealing, Starbridge Venture Capital)
Homework 3

Rate the robots

Use the TRL and MRL definitions and the worked examples in the TRL and MRL section above. For each Hexpave Lunar and One-Sixth Park subsystem below, read the evidence, then pick a TRL and decide which company carries the risk. There is no single right answer: defend your choice in the box under each one.

H3.1

Which subsystem is the lowest TRL in the whole plan, and which phase does it block?

H3.2

Where does the evidence come from a different setting (Mars, the ISS, a lab on Earth)? How much should that count?